Steel space grid gas station project construction

Ise agbese yii jẹ aaye aaye aaye square / iga 16 mita / lapapọ ipari 30 mita / lapapọ awọn mita 18

1. Awọn fifi sori ẹrọ ti awọn irin aaye fireemu gbọdọ wa ni ti gbe jade lẹhin ti awọn gbigba ti awọn kekere be axis ati awọn ifibọ ọkọ.Awọn ibeere fun atilẹyin isalẹ ni: iyatọ giga laarin awọn atilẹyin ti o wa nitosi (ijinna L2): iye kekere ti L2 / 800 ati 10mm, ni giga kanna Iyatọ Giga laarin atilẹyin ti o ga julọ ati isalẹ: 20mm;

2. Ṣe ipinnu ilana fifi sori ẹrọ ti aaye aaye irin ni ibamu si agbara ati awọn abuda igbekale ti akoj ati awọn ipo ikole gangan lori aaye;

3. Lẹhin ti irin aaye aaye ti fi sori ẹrọ, o yẹ ki o ṣayẹwo:

a.Awọn iyọọda iye ti inaro ati petele ipari iyapa ẹgbẹ jẹ 1/2000 ti awọn ipari, ati ki o ko yẹ ki o tobi ju 30mm;

b.Iwọn iyọọda ti aiṣedeede aarin yẹ ki o jẹ 1/3000 ti igba ti fireemu aaye irin, ati pe ko yẹ ki o tobi ju 30mm;

c.Fun fireemu apapo ti o ni atilẹyin nipasẹ ẹba, iyapa iga ti o gba laaye jẹ 1/400 ti atilẹyin ti o wa nitosi, ati pe ko yẹ ki o tobi ju 15mm, ati pe o pọju ati kere julọ ko yẹ ki o tobi ju 30mm;fun fireemu apapo ti o ni atilẹyin nipasẹ awọn aaye pupọ, iyapa iga ti o gba laaye jẹ 1/800 ti atilẹyin ti o wa nitosi, ati pe ko yẹ ki o tobi ju 30mm;

d.Ṣewadii iyipada ti akoj ni ibamu si awọn pato ati awọn ibeere apẹrẹ.Lẹhin ikole, iyipada ti fireemu aaye irin ko ni tobi ju 115% ti iye iṣiro apẹrẹ.(Iye iyipada ti o pọju ti fireemu akoj L/250)

4. Ti o ba ti nibẹ ni o wa alurinmorin balls tibile, yara alurinmorin ti lo fun alurinmorin rogodo alurinmorin ati ọpá, ati awọn alurinmorin pelu ite ko yẹ ki o wa ni kekere ju awọn keji ite.

5. Lẹhin fifi sori ẹrọ ti irin aaye aaye ti o wa ni irin, awọn dada ti awọn aaye fireemu awọn isẹpo ati awọn ọpa yẹ ki o wa ni mimọ ati ki o free ti awọn aleebu ati ki o dọti.Awọn isẹpo ati awọn ihò ti o pọju ti awọn isẹpo rogodo boluti yẹ ki o kun ati ki o fi edidi pẹlu girisi.

6. Nigba lilo awọn akoj, okeerẹ egboogi-ipata itọju yẹ ki o wa ti gbe jade gbogbo 4 si 5 ọdun.

 

1. The installation of the grid frame must be carried out after the acceptance of the lower structure axis and the embedded board. The requirements for the lower support are: the height difference between adjacent supports (distance L2): the smaller value of L2/800 and 10mm, at the same elevation Height difference between the highest and lowest support: 20mm; 2. Determine the installation process of the grid according to the force and structural characteristics of the grid and the actual construction conditions on site; 3. After the grid frame is installed, it should be checked: a. The allowable value of the vertical and horizontal side length deviation is 1/2000 of the length, and should not be greater than 30mm; b. The allowable value of center offset should be 1/3000 of the span of the grid, and should not be greater than 30mm; c. For the mesh frame supported by the periphery, the allowable height deviation is 1/400 of the adjacent support, and should not be greater than 15mm, and the maximum and minimum should not be greater than 30mm; for the mesh frame supported by multiple points, the allowable height deviation is 1/800 of the adjacent support, and should not be greater than 30mm; d. Detect the deflection of the grid according to the specifications and design requirements. After construction, the deflection of the grid frame shall not be greater than 115% of the design calculation value. (Maximum deflection value of grid frame L/250) 4. If there are welding balls locally, groove welding is used for welding the welding ball and the rod, and the welding seam grade should not be lower than the second grade. 5. After the installation of the grid frame is completed, the surface of the joints and rods should be clean and free of scars and dirt. The joints and excess holes of the bolt ball joints should be filled and sealed with grease. 6. During the use of the grid, comprehensive anti-corrosion maintenance should be carried out every 4 to 5 years.
1. The installation of the grid frame must be carried out after the acceptance of the lower structure axis and the embedded board. The requirements for the lower support are: the height difference between adjacent supports (distance L2): the smaller value of L2/800 and 10mm, at the same elevation Height difference between the highest and lowest support: 20mm; 2. Determine the installation process of the grid according to the force and structural characteristics of the grid and the actual construction conditions on site; 3. After the grid frame is installed, it should be checked: a. The allowable value of the vertical and horizontal side length deviation is 1/2000 of the length, and should not be greater than 30mm; b. The allowable value of center offset should be 1/3000 of the span of the grid, and should not be greater than 30mm; c. For the mesh frame supported by the periphery, the allowable height deviation is 1/400 of the adjacent support, and should not be greater than 15mm, and the maximum and minimum should not be greater than 30mm; for the mesh frame supported by multiple points, the allowable height deviation is 1/800 of the adjacent support, and should not be greater than 30mm; d. Detect the deflection of the grid according to the specifications and design requirements. After construction, the deflection of the grid frame shall not be greater than 115% of the design calculation value. (Maximum deflection value of grid frame L/250) 4. If there are welding balls locally, groove welding is used for welding the welding ball and the rod, and the welding seam grade should not be lower than the second grade. 5. After the installation of the grid frame is completed, the surface of the joints and rods should be clean and free of scars and dirt. The joints and excess holes of the bolt ball joints should be filled and sealed with grease. 6. During the use of the grid, comprehensive anti-corrosion maintenance should be carried out every 4 to 5 years.
1. The installation of the grid frame must be carried out after the acceptance of the lower structure axis and the embedded board. The requirements for the lower support are: the height difference between adjacent supports (distance L2): the smaller value of L2/800 and 10mm, at the same elevation Height difference between the highest and lowest support: 20mm; 2. Determine the installation process of the grid according to the force and structural characteristics of the grid and the actual construction conditions on site; 3. After the grid frame is installed, it should be checked: a. The allowable value of the vertical and horizontal side length deviation is 1/2000 of the length, and should not be greater than 30mm; b. The allowable value of center offset should be 1/3000 of the span of the grid, and should not be greater than 30mm; c. For the mesh frame supported by the periphery, the allowable height deviation is 1/400 of the adjacent support, and should not be greater than 15mm, and the maximum and minimum should not be greater than 30mm; for the mesh frame supported by multiple points, the allowable height deviation is 1/800 of the adjacent support, and should not be greater than 30mm; d. Detect the deflection of the grid according to the specifications and design requirements. After construction, the deflection of the grid frame shall not be greater than 115% of the design calculation value. (Maximum deflection value of grid frame L/250) 4. If there are welding balls locally, groove welding is used for welding the welding ball and the rod, and the welding seam grade should not be lower than the second grade. 5. After the installation of the grid frame is completed, the surface of the joints and rods should be clean and free of scars and dirt. The joints and excess holes of the bolt ball joints should be filled and sealed with grease. 6. During the use of the grid, comprehensive anti-corrosion maintenance should be carried out every 4 to 5 years.

Akoko ifiweranṣẹ: Oṣu Kẹta-10-2022