page_head_Bg

Awọn iṣẹ akanṣe

Kaabo, wa lati kan si awọn ọja wa!
/steel-space-grid-painting-process-product/

Ise agbese yii jẹ aaye aaye ile-iṣẹ ologbele-ipin / giga jẹ awọn mita 51 / ipari lapapọ 688 awọn mita / lapapọ awọn mita 46

Awọn kọmputa eto laifọwọyi fọọmu awọn ara-àdánù ti awọn irin aaye fireemu;

Ẹru naa gbọdọ ṣiṣẹ lori awọn apa, ati awọn ọmọ ẹgbẹ ko ni awọn ẹru ita;

Eto fireemu yẹ ki o wa muna ni ibamu pẹlu boṣewa ile-iṣẹ “awọn isẹpo fireemu aaye aaye boluti isẹpo” JG/T10-2009

 

Irin aaye fireemu ti wa ni iṣiro ati apẹrẹ nipasẹ MST2020 software.

Ni afikun si ipade awọn ibeere ti koodu ohun elo ti orilẹ-ede, irin ti a lo ninu iṣẹ akanṣe yii yẹ ki o tun pade awọn ibeere wọnyi:

a) Ipin ti iye iwọn ti agbara ikore ti irin si iye iwọn ti agbara fifẹ ko yẹ ki o tobi ju 0.85;

b) Irin yẹ ki o ni awọn igbesẹ ikore ti o han gbangba, ati elongation yẹ ki o tobi ju 20%;

c) Awọn irin yẹ ki o ni ti o dara weldability ati oṣiṣẹ toughness ikolu;

Apẹrẹ aaye aaye irin gba 3D3S (ẹya 14.0) apẹrẹ sọfitiwia ti ọna pipe paipu apẹrẹ iranlọwọ kọmputa ati eto iṣelọpọ lati ṣe itupalẹ agbara inu ti awọn ọmọ ẹgbẹ ati apẹrẹ adaṣe ti aapọn kikun lori microcomputer, ati ara- fifuye àdánù ti awọn akoj fireemu ti wa ni laifọwọyi superimposed ninu awọn ti abẹnu agbara onínọmbà.

Awọn iṣiro ipari ti awọn ọpa jẹ L0 = L, ati awọn slenderness ratio ti awọn bọtini opa ni tie opa ≤ 200 ati funmorawon opa ≤ 150. Awọn slenderness ratio ti miiran ọpá ni tai opa ≤ 250, titẹ opa ≤ 180.

 

This project is a semi-circular industrial space frame / height is 51 meters / total length 688 meters / total span 46 meters The computer program automatically forms the self-weight of the grid; The load must act on the nodes, and the members do not bear lateral loads; The frame structure should be strictly in accordance with the industry standard "Steel grid bolt ball joint" JG/T10-2009
This project is a semi-circular industrial space frame / height is 51 meters / total length 688 meters / total span 46 meters The computer program automatically forms the self-weight of the grid; The load must act on the nodes, and the members do not bear lateral loads; The frame structure should be strictly in accordance with the industry standard "Steel grid bolt ball joint" JG/T10-2009
2 (2)
This project is a semi-circular industrial space frame / height is 51 meters / total length 688 meters / total span 46 meters The computer program automatically forms the self-weight of the grid; The load must act on the nodes, and the members do not bear lateral loads; The frame structure should be strictly in accordance with the industry standard "Steel grid bolt ball joint" JG/T10-2009

Akoko ifiweranṣẹ: Oṣu Kẹta-10-2022